Ironclad Earthworks acted as the prime contractor for the Shepard Landfill Project for the City of Calgary, Waste and Recycling Services. The project involved landfill cell construction and large-scale earthworks, including site grading, liner systems, granular imports, and topsoil placement, delivered under an aggressive schedule and challenging weather conditions.

KEY DETAILS

Contract Value

$7,380,000

Project Owner

City of Calgary, Waste and Recycling Services

Completion Date

December 2025

Project Role

Prime Contractor

Scope of Work

  • Topsoil stripping
  • Site grading
  • Landfill cell construction including clay liner
  • Import of various granular materials
  • Leachate collection system installation by subcontractor
  • Geosynthetic liner system installation by subcontractor
  • Design-build replacement of existing HDPE manhole
  • Litter fence installation
  • Topsoil placement
No items found.

Resources & Challenges

  • Total Crew: 25 Persons
  • Equipment Used:
    6 Twin Engine Scrapers, 6 40-ton Rock Trucks, 4 Excavators, 3 Dozers, 4 Cat 815 packers, Bomag BC 473 packer, Tractor and disc, Motor grader, 2 Skid steers, 2 Water trucks, 12 Highway dump trucks
  • Challenges:
  • An aggressive project schedule combined with scope changes during construction.
  • Unprecedented rainfall requiring extensive care-of-water measures.
  • The project required 24-hour workdays and seven-day workweeks for three consecutive months to meet the aggressive schedule.

Project Timeline

//   May 2023

Drilling & Pressure Grouting

//   May 2024

Sheet Pile Core Wall & Concrete Work

//   July 2024

Embankment Structure

//   September 2024

Spillway and Concrete Work

//   October 2024

Final Dam Commissioning